Gaziantep · Şehitkamil · 2017

Gaziantep Merinos Mosque — Fluted-Shaft Minaret

Gaziantep Merinos Mosque minaret — fluted shaft and timber scaffold
Gaziantep Merinos Mosque minaret — fluted shaft and timber scaffold

In brief

The minaret of Gaziantep Merinos Mosque was built by Zahan İnşaat in 2017 using in-situ casting. The flutes running the full height of the shaft were formed out of the concrete itself with bespoke fibreglass-faced formwork modules; the relief motifs at the base came from the same formwork system.

Shaft
Fluted, cast in situ
Method
Modular formwork with fibreglass face
Location
Gaziantep
Year built
2017
Structure type
Mosque minaret
Service line
Minaret Construction

A fluted shaft is the detail most often asked for on a minaret and most often executed badly. Flutes cut into render break away at the arrises within a few years; added in plaster, they fall off in the first winter. The right way is for the flute to come out of the concrete itself.

On the Merinos Mosque minaret a fibreglass shell was applied to the inner face of the formwork modules and the flute profiles were worked into that shell. When the formwork was struck, the flutes emerged in the same concrete as the shaft, with a smooth face.

Resolving the flute detail in the formwork

A fluted shaft presents two technical difficulties. First, because the shaft tapers upwards, the flute width has to narrow proportionally; a flute of constant width looks too heavy against the shaft higher up. Second, enough draft angle must be left so that the arrises are not damaged when the formwork is struck. We design the formwork modules around those two constraints.

Base motifs

The base carries a relief border and rosette motifs. That section was cast with formwork separate from the shaft; because the motif negatives were worked into the fibreglass shell, the concrete surface came out finished with no further treatment.

Site photographs

4 frames. Tap a photograph to enlarge it.

Gaziantep Merinos Mosque minaret — fluted shaft and timber scaffold
Relief border and motif detail at the minaret base
Close view of the fluted shaft surface after the formwork was struck
Upward perspective of the fluted minaret shaft seen through the scaffold

Frequently asked questions about this project

Does a fluted minaret shaft add to the cost?

Flutes increase the formwork cost; they do not change the quantity of concrete or reinforcement. Because the formwork can be reused once made, the extra cost is quickly amortised where more than one minaret of the same type is built.

Can flutes be cut afterwards?

Technically yes, but we do not recommend it. Channels ground in later or cut into render reduce the concrete cover and break away at the arrises over time. Bringing the flute off the formwork is the right method both visually and for durability.

A similar job

Get a quote for Minaret Construction

Share the dimensions and the current condition; we will price it item by item.