In brief
The carbon fibre strengthening of the Rossmarin Residences in Göcek, Muğla was carried out by Zahan İnşaat in 2024. On a building close to the sea, damaged concrete was first repaired against reinforcement corrosion, after which carbon fibre reinforcement was applied to the columns and beams.
- Year
- 2024
- Method
- Concrete repair + carbon fibre reinforcement
- Location
- Göcek / Muğla
- Structure type
- Residential development
- Particular condition
- Seafront, salt-laden damp
- Service line
- Carbon Fibre Strengthening
In buildings on the coast, reinforced concrete follows a different ageing curve from those inland. Salt-laden damp passes through the cover and reaches the reinforcement; the steel corrodes and expands, pushing the concrete away — the cover cracks, then spalls.
At Rossmarin Residences in Göcek the work therefore came in two stages: first the concrete sections degraded by corrosion were repaired, then carbon fibre reinforcement was applied. The order matters; reinforcement applied over a degraded surface will not hold, however well it is calculated.
The order of work on a coastal building
In a structure with corrosion damage the correct sequence is this:
- Damaged concrete is broken out back to sound section — leaving unsound material means the problem continues inside.
- Exposed reinforcement is cleaned of rust and coated with a corrosion inhibitor.
- The section is reinstated with a high-bond repair mortar.
- The surface is prepared and the carbon fibre reinforcement applied.
- The system is finished with a protective coating against UV and mechanical damage.
Working with residents’ management
In residential developments the work bears directly on people’s daily lives. It is staged block by block, parking and access roads are kept usable throughout, and noisy operations are tied to set hours. The stage programme is issued to the management in writing, so residents know in advance what happens when.
Site photographs
10 frames. Tap a photograph to enlarge it.
Frequently asked questions about this project
The cover is spalling on our coastal building — what should we do?
Spalling cover is a sign that corrosion has progressed. What is needed is to break out the damaged section, clean the reinforcement and reinstate the section with repair mortar. Simply rendering over it makes the problem invisible but does not stop it; within a few years it reappears in the same place.
How should we start as a residents’ management?
An assessment of the current condition comes first: how widespread the damage is, how far reinforcement corrosion has gone and the general state of the structural system. Without that report, any price given is unrealistic. After the survey we separate the scope block by block and offer a staged tender, so the budget can be spread over several years.
Do you work in Muğla and the Aegean region?
Yes. This project in Göcek is among the works we have completed in the region. We take strengthening and waterproofing work throughout Türkiye, and in coastal areas we select materials for salt-laden damp.
A similar job
Get a quote for Carbon Fibre Strengthening
Share the dimensions and the current condition; we will price it item by item.
Çobanözü Mah. Toybelen Küçük Sanayi Sitesi, Atakum / Samsun
Our other projects
İstiklal Street Ziraat Bank Carbon Fibre Strengthening
Carbon fibre strengthening in a bank building on İstiklal Street — added capacity without enlarging the section, in a historic fabric.
Mercedes Mengerler Samsun Strengthening
Carbon fibre strengthening at the Mengerler Samsun facility — staged so the service centre and showroom kept working.
Isparta City Hospital Carbon Plate Strengthening
Beam strengthening in a working city hospital: carbon plate, epoxy bonding and staged work that never interrupted patient movement.