İstanbul · Beyoğlu · 2025
İstiklal Street Ziraat Bank — Carbon Fibre Strengthening
In brief
The carbon fibre strengthening of the Ziraat Bank building on İstiklal Street, Beyoğlu, İstanbul was carried out by Zahan İnşaat in 2025. In a historic and densely built urban fabric, the carbon fibre method was chosen because it neither enlarges sections nor requires heavy plant; columns were wrapped with fabric and beams reinforced with plate.
- Year
- 2025
- Scope
- Column wrapping and beam reinforcement
- Method
- Carbon fibre fabric and plate
- Location
- İstiklal Street, Beyoğlu / İstanbul
- Structure type
- Bank building
- Service line
- Carbon Fibre Strengthening
Setting up a site on İstiklal Street is a problem in itself. Vehicle access is restricted, pedestrian traffic is heavy and the neighbouring buildings are historic. Under those conditions, strengthening methods needing heavy plant and extensive breaking out are ruled out from the start.
Carbon fibre suits exactly this kind of building: the material can be carried by hand, breaking out is minimal, sections do not grow and the work can be staged. At the Ziraat Bank building the columns were wrapped with fabric and the beams reinforced with plate.
Strengthening within a historic fabric
Working in a setting that has to be protected, method matters as much as the technical decision. The advantages of carbon fibre in that context:
- Sections do not grow — the architectural space and storey height are preserved.
- No heavy plant — the need for cranes and lorries in a narrow street falls away.
- It adds no dead load to the structure — the foundation capacity is not pushed.
- The intervention is reversible — it does not prevent a different approach in the future.
Direction and lap in a column wrap
In a column wrap the fibre direction must run perpendicular to the section; the wrap confines the concrete and increases ductility. Where the lap length is left short, the wrap opens at precisely the moment it is needed. At the corners the concrete is chamfered — a sharp arris cuts the fabric under load.
Site photographs
10 frames. Tap a photograph to enlarge it.
Frequently asked questions about this project
Can strengthening be done while a bank branch or office is working?
Yes, largely so with carbon fibre. We run the work outside business hours and in stages; during the dust-producing surface preparation the area is temporarily separated. On this project, too, the working hours were planned around the density of the city centre.
How long does carbon fibre strengthening last?
Correctly applied and protected from UV and mechanical damage, a carbon fibre system serves for the remaining life of the building. Carbon fibre does not corrode; the weak link in the system is the epoxy bond, which is why surface preparation and curing conditions are decisive.
A similar job
Get a quote for Carbon Fibre Strengthening
Share the dimensions and the current condition; we will price it item by item.
Çobanözü Mah. Toybelen Küçük Sanayi Sitesi, Atakum / Samsun
Our other projects
Mercedes Mengerler Samsun Strengthening
Carbon fibre strengthening at the Mengerler Samsun facility — staged so the service centre and showroom kept working.
Isparta City Hospital Carbon Plate Strengthening
Beam strengthening in a working city hospital: carbon plate, epoxy bonding and staged work that never interrupted patient movement.
Carbon Fibre and Reinforced-Concrete Strengthening
Four methods in one building: column jacketing, carbon fibre column wrapping, carbon laminates embedded in the slab and carbon fabric overlay on walls.